THE SCOPE:
Assemble and install all annex buildings, as well as 6 OTSG boilers and all the interconnecting pipe, crossover ducting, economizers, stacks, structural steel, burner management systems, blowers, pre-heaters, and associated ducting.
The project began with Phoenix Industrial installing these 6 new boilers at Devon Jackfish 3. Our scope was then expanded to include the replacement of 6 boiler economizers at Devon Jackfish 2.
TYPE OF PROJECT:
SAGD Systems
MANAGEMENT OF SUB-CONTRACTORS:
Applus RDT and GST Trucking. All other craft labour was completed directly by Phoenix Industrial.
MANPOWER REQUIRED:
30,000 man-hours with a additional 10,000 man-hours at Devon Jackfish 2.
SAFETY RECORD:
Completed with 0 lost time incidents.